3435 Broadway, Kansas City, Missouri

Building Systems Upgrades

HVAC upgrades are performed due to inadequate cooling or heating. A detailed load analysis determines the most cost effective equipment replacement. Chiller and boiler upgrades are undertaken to replace existing equipment, originally designed for occupancies considerably different than present. The units usually have excessive operating and maintenance costs and have exceeded expected service life. A discounted cash flow analysis of the capital cost of new equipment can often justify replacement of systems still in good operating condition.